{"id":135971,"date":"2024-06-05T07:00:00","date_gmt":"2024-06-05T07:00:00","guid":{"rendered":"https:\/\/www.pv-tech.org\/?post_type=technical-papers&#038;p=135971"},"modified":"2024-05-08T16:30:33","modified_gmt":"2024-05-08T16:30:33","slug":"next-generation-high-throughput-cell-production-technologies-impact-on-equipment-capex-footprint-and-labour-requirements-for-a-10gwp-pv-cell-factory","status":"publish","type":"technical-papers","link":"https:\/\/www.pv-tech.org\/technical-papers\/next-generation-high-throughput-cell-production-technologies-impact-on-equipment-capex-footprint-and-labour-requirements-for-a-10gwp-pv-cell-factory\/","title":{"rendered":"Next-generation high-throughput cell production technologies \u2013 impact on equipment CAPEX, footprint and labour requirements for a 10GWp PV cell factory"},"content":{"rendered":"\n<p>With the expected increase in annual photovoltaic production capacity beyond 1TWp\/a (terrawatt-peak per year), the emphasis on novel, next-generation production technologies gains significance from the perspective of potentially lowering production costs as well as increasing sustainability by reducing the resources required in manufacturing. The focus of this work is to analyse the impact of high-throughput (HTP), next-generation silicon solar cell production technologies, as developed within the framework of the NextTec research and development project, on the required i) amount of equipment, ii) capital expenditure (CAPEX) and iii) labour, herein termed as key performance indicators (KPIs), for a solar cell production facility with an annual capacity of 10GWp.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>With the expected increase in annual photovoltaic production capacity beyond 1TWp\/a (terrawatt-peak per year), the emphasis on novel, next-generation production technologies gains significance from the perspective of potentially lowering production costs as well as increasing sustainability by reducing the resources required in manufacturing. The focus of this work is to analyse the impact of high-throughput (HTP), next-generation silicon solar cell production technologies, as developed within the framework of the NextTec research and development project, on the required i) amount of equipment, ii) capital expenditure (CAPEX) and iii) labour, herein termed as key performance indicators (KPIs), for a solar cell production facility with an annual capacity of 10GWp.<\/p>\n","protected":false},"author":172,"featured_media":135972,"template":"","paywall-tags":[8671],"technical-papers-categories":[2920,2921],"class_list":["post-135971","technical-papers","type-technical-papers","status-publish","has-post-thumbnail","hentry","paywall-tags-premium","technical-papers-categories-cell-processing","technical-papers-categories-photovoltaics-international-papers"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v25.5 (Yoast SEO v25.5) - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Next-generation high-throughput cell production technologies \u2013 impact on equipment CAPEX, footprint and labour requirements for a 10GWp PV cell factory - PV Tech<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.pv-tech.org\/technical-papers\/next-generation-high-throughput-cell-production-technologies-impact-on-equipment-capex-footprint-and-labour-requirements-for-a-10gwp-pv-cell-factory\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Next-generation high-throughput cell production technologies \u2013 impact on equipment CAPEX, footprint and labour requirements for a 10GWp PV cell factory\" \/>\n<meta property=\"og:description\" content=\"With the expected increase in annual photovoltaic production capacity beyond 1TWp\/a (terrawatt-peak per year), the emphasis on novel, next-generation production technologies gains significance from the perspective of potentially lowering production costs as well as increasing sustainability by reducing the resources required in manufacturing. The focus of this work is to analyse the impact of high-throughput (HTP), next-generation silicon solar cell production technologies, as developed within the framework of the NextTec research and development project, on the required i) amount of equipment, ii) capital expenditure (CAPEX) and iii) labour, herein termed as key performance indicators (KPIs), for a solar cell production facility with an annual capacity of 10GWp.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.pv-tech.org\/technical-papers\/next-generation-high-throughput-cell-production-technologies-impact-on-equipment-capex-footprint-and-labour-requirements-for-a-10gwp-pv-cell-factory\/\" \/>\n<meta property=\"og:site_name\" content=\"PV Tech\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/pages\/PV-Tech\/360525490632679\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.pv-tech.org\/wp-content\/uploads\/2024\/05\/Next-generation-high-throughput.png\" \/>\n\t<meta property=\"og:image:width\" content=\"906\" \/>\n\t<meta property=\"og:image:height\" content=\"828\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:site\" content=\"@pv_tech\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.pv-tech.org\/technical-papers\/next-generation-high-throughput-cell-production-technologies-impact-on-equipment-capex-footprint-and-labour-requirements-for-a-10gwp-pv-cell-factory\/\",\"url\":\"https:\/\/www.pv-tech.org\/technical-papers\/next-generation-high-throughput-cell-production-technologies-impact-on-equipment-capex-footprint-and-labour-requirements-for-a-10gwp-pv-cell-factory\/\",\"name\":\"Next-generation high-throughput cell production technologies \u2013 impact on equipment CAPEX, footprint and labour requirements for a 10GWp PV cell factory - PV Tech\",\"isPartOf\":{\"@id\":\"https:\/\/www.pv-tech.org\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.pv-tech.org\/technical-papers\/next-generation-high-throughput-cell-production-technologies-impact-on-equipment-capex-footprint-and-labour-requirements-for-a-10gwp-pv-cell-factory\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.pv-tech.org\/technical-papers\/next-generation-high-throughput-cell-production-technologies-impact-on-equipment-capex-footprint-and-labour-requirements-for-a-10gwp-pv-cell-factory\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.pv-tech.org\/wp-content\/uploads\/2024\/05\/Next-generation-high-throughput.png\",\"datePublished\":\"2024-06-05T07:00:00+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/www.pv-tech.org\/technical-papers\/next-generation-high-throughput-cell-production-technologies-impact-on-equipment-capex-footprint-and-labour-requirements-for-a-10gwp-pv-cell-factory\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.pv-tech.org\/technical-papers\/next-generation-high-throughput-cell-production-technologies-impact-on-equipment-capex-footprint-and-labour-requirements-for-a-10gwp-pv-cell-factory\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pv-tech.org\/technical-papers\/next-generation-high-throughput-cell-production-technologies-impact-on-equipment-capex-footprint-and-labour-requirements-for-a-10gwp-pv-cell-factory\/#primaryimage\",\"url\":\"https:\/\/www.pv-tech.org\/wp-content\/uploads\/2024\/05\/Next-generation-high-throughput.png\",\"contentUrl\":\"https:\/\/www.pv-tech.org\/wp-content\/uploads\/2024\/05\/Next-generation-high-throughput.png\",\"width\":906,\"height\":828},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.pv-tech.org\/technical-papers\/next-generation-high-throughput-cell-production-technologies-impact-on-equipment-capex-footprint-and-labour-requirements-for-a-10gwp-pv-cell-factory\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.pv-tech.org\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Technical Papers\",\"item\":\"https:\/\/www.pv-tech.org\/technical-papers\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Next-generation high-throughput cell production technologies \u2013 impact on equipment CAPEX, footprint and labour requirements for a 10GWp PV cell factory\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.pv-tech.org\/#website\",\"url\":\"https:\/\/www.pv-tech.org\/\",\"name\":\"PV Tech\",\"description\":\"The number one source for in-depth and up-to-the-minute news, technical articles, blogs and reviews on the international solar PV supply chain.\",\"publisher\":{\"@id\":\"https:\/\/www.pv-tech.org\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.pv-tech.org\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.pv-tech.org\/#organization\",\"name\":\"PV Tech\",\"url\":\"https:\/\/www.pv-tech.org\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.pv-tech.org\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.pv-tech.org\/wp-content\/uploads\/2020\/11\/pv-tech-logo.png\",\"contentUrl\":\"https:\/\/www.pv-tech.org\/wp-content\/uploads\/2020\/11\/pv-tech-logo.png\",\"width\":437,\"height\":100,\"caption\":\"PV Tech\"},\"image\":{\"@id\":\"https:\/\/www.pv-tech.org\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/pages\/PV-Tech\/360525490632679\",\"https:\/\/x.com\/pv_tech\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Next-generation high-throughput cell production technologies \u2013 impact on equipment CAPEX, footprint and labour requirements for a 10GWp PV cell factory - PV Tech","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.pv-tech.org\/technical-papers\/next-generation-high-throughput-cell-production-technologies-impact-on-equipment-capex-footprint-and-labour-requirements-for-a-10gwp-pv-cell-factory\/","og_locale":"en_US","og_type":"article","og_title":"Next-generation high-throughput cell production technologies \u2013 impact on equipment CAPEX, footprint and labour requirements for a 10GWp PV cell factory","og_description":"With the expected increase in annual photovoltaic production capacity beyond 1TWp\/a (terrawatt-peak per year), the emphasis on novel, next-generation production technologies gains significance from the perspective of potentially lowering production costs as well as increasing sustainability by reducing the resources required in manufacturing. The focus of this work is to analyse the impact of high-throughput (HTP), next-generation silicon solar cell production technologies, as developed within the framework of the NextTec research and development project, on the required i) amount of equipment, ii) capital expenditure (CAPEX) and iii) labour, herein termed as key performance indicators (KPIs), for a solar cell production facility with an annual capacity of 10GWp.","og_url":"https:\/\/www.pv-tech.org\/technical-papers\/next-generation-high-throughput-cell-production-technologies-impact-on-equipment-capex-footprint-and-labour-requirements-for-a-10gwp-pv-cell-factory\/","og_site_name":"PV Tech","article_publisher":"https:\/\/www.facebook.com\/pages\/PV-Tech\/360525490632679","og_image":[{"width":906,"height":828,"url":"https:\/\/www.pv-tech.org\/wp-content\/uploads\/2024\/05\/Next-generation-high-throughput.png","type":"image\/png"}],"twitter_card":"summary_large_image","twitter_site":"@pv_tech","twitter_misc":{"Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.pv-tech.org\/technical-papers\/next-generation-high-throughput-cell-production-technologies-impact-on-equipment-capex-footprint-and-labour-requirements-for-a-10gwp-pv-cell-factory\/","url":"https:\/\/www.pv-tech.org\/technical-papers\/next-generation-high-throughput-cell-production-technologies-impact-on-equipment-capex-footprint-and-labour-requirements-for-a-10gwp-pv-cell-factory\/","name":"Next-generation high-throughput cell production technologies \u2013 impact on equipment CAPEX, footprint and labour requirements for a 10GWp PV cell factory - PV Tech","isPartOf":{"@id":"https:\/\/www.pv-tech.org\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.pv-tech.org\/technical-papers\/next-generation-high-throughput-cell-production-technologies-impact-on-equipment-capex-footprint-and-labour-requirements-for-a-10gwp-pv-cell-factory\/#primaryimage"},"image":{"@id":"https:\/\/www.pv-tech.org\/technical-papers\/next-generation-high-throughput-cell-production-technologies-impact-on-equipment-capex-footprint-and-labour-requirements-for-a-10gwp-pv-cell-factory\/#primaryimage"},"thumbnailUrl":"https:\/\/www.pv-tech.org\/wp-content\/uploads\/2024\/05\/Next-generation-high-throughput.png","datePublished":"2024-06-05T07:00:00+00:00","breadcrumb":{"@id":"https:\/\/www.pv-tech.org\/technical-papers\/next-generation-high-throughput-cell-production-technologies-impact-on-equipment-capex-footprint-and-labour-requirements-for-a-10gwp-pv-cell-factory\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.pv-tech.org\/technical-papers\/next-generation-high-throughput-cell-production-technologies-impact-on-equipment-capex-footprint-and-labour-requirements-for-a-10gwp-pv-cell-factory\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pv-tech.org\/technical-papers\/next-generation-high-throughput-cell-production-technologies-impact-on-equipment-capex-footprint-and-labour-requirements-for-a-10gwp-pv-cell-factory\/#primaryimage","url":"https:\/\/www.pv-tech.org\/wp-content\/uploads\/2024\/05\/Next-generation-high-throughput.png","contentUrl":"https:\/\/www.pv-tech.org\/wp-content\/uploads\/2024\/05\/Next-generation-high-throughput.png","width":906,"height":828},{"@type":"BreadcrumbList","@id":"https:\/\/www.pv-tech.org\/technical-papers\/next-generation-high-throughput-cell-production-technologies-impact-on-equipment-capex-footprint-and-labour-requirements-for-a-10gwp-pv-cell-factory\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.pv-tech.org\/"},{"@type":"ListItem","position":2,"name":"Technical Papers","item":"https:\/\/www.pv-tech.org\/technical-papers\/"},{"@type":"ListItem","position":3,"name":"Next-generation high-throughput cell production technologies \u2013 impact on equipment CAPEX, footprint and labour requirements for a 10GWp PV cell factory"}]},{"@type":"WebSite","@id":"https:\/\/www.pv-tech.org\/#website","url":"https:\/\/www.pv-tech.org\/","name":"PV Tech","description":"The number one source for in-depth and up-to-the-minute news, technical articles, blogs and reviews on the international solar PV supply chain.","publisher":{"@id":"https:\/\/www.pv-tech.org\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.pv-tech.org\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.pv-tech.org\/#organization","name":"PV Tech","url":"https:\/\/www.pv-tech.org\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.pv-tech.org\/#\/schema\/logo\/image\/","url":"https:\/\/www.pv-tech.org\/wp-content\/uploads\/2020\/11\/pv-tech-logo.png","contentUrl":"https:\/\/www.pv-tech.org\/wp-content\/uploads\/2020\/11\/pv-tech-logo.png","width":437,"height":100,"caption":"PV Tech"},"image":{"@id":"https:\/\/www.pv-tech.org\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/pages\/PV-Tech\/360525490632679","https:\/\/x.com\/pv_tech"]}]}},"_links":{"self":[{"href":"https:\/\/www.pv-tech.org\/wp-json\/wp\/v2\/technical-papers\/135971","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.pv-tech.org\/wp-json\/wp\/v2\/technical-papers"}],"about":[{"href":"https:\/\/www.pv-tech.org\/wp-json\/wp\/v2\/types\/technical-papers"}],"author":[{"embeddable":true,"href":"https:\/\/www.pv-tech.org\/wp-json\/wp\/v2\/users\/172"}],"version-history":[{"count":1,"href":"https:\/\/www.pv-tech.org\/wp-json\/wp\/v2\/technical-papers\/135971\/revisions"}],"predecessor-version":[{"id":137206,"href":"https:\/\/www.pv-tech.org\/wp-json\/wp\/v2\/technical-papers\/135971\/revisions\/137206"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.pv-tech.org\/wp-json\/wp\/v2\/media\/135972"}],"wp:attachment":[{"href":"https:\/\/www.pv-tech.org\/wp-json\/wp\/v2\/media?parent=135971"}],"wp:term":[{"taxonomy":"paywall-tags","embeddable":true,"href":"https:\/\/www.pv-tech.org\/wp-json\/wp\/v2\/paywall-tags?post=135971"},{"taxonomy":"technical-papers-categories","embeddable":true,"href":"https:\/\/www.pv-tech.org\/wp-json\/wp\/v2\/technical-papers-categories?post=135971"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}